资源类型

期刊论文 451

会议视频 10

年份

2023 48

2022 41

2021 51

2020 26

2019 28

2018 28

2017 29

2016 18

2015 23

2014 15

2013 16

2012 15

2011 11

2010 16

2009 14

2008 10

2007 15

2006 6

2005 7

2004 4

展开 ︾

关键词

制氢 4

优化调度 3

可持续发展 3

智能制造 3

农业科学 2

动物养殖 2

厌氧消化 2

发展趋势 2

可再生能源 2

工业4.0 2

工业物联网 2

生产调度 2

1 1

5-戊二胺 1

cyp17a1 1

Backbone 1

CO2利用 1

CPU-GPU异构;多核;共享内存;访存调度 1

DQ&P 1

展开 ︾

检索范围:

排序: 展示方式:

Lessons learned from developing and implementing refinery production scheduling technologies

Marcel JOLY, Mario Y. MIYAKE

《工程管理前沿(英文)》 2017年 第4卷 第3期   页码 325-337 doi: 10.15302/J-FEM-2017033

摘要: An increasing number of novel and highly specialized computer-aided decision-making technologies for short-term production scheduling in oil refineries has emerged and evolved over the past two decades, thereby encouraging refiners to permanently rethink the way the refining business is operated and managed. In this report, we discuss the key lessons learned from one of the pioneering, yet daring, enterprise-wide programs entirely implemented in an energy company devoted to developing and implementing an advanced refinery production scheduling (RPS) technology, i.e., the RPS system of Petrobras. Apart from mathematical and information technology issues, the long-term sustainability of a successful RPS project is, we argue, the outcome of a virtuous cycle grounded on permanent actions devoted to improving technical education inside the organization, reinspecting organizational cultures and operational paradigms, and developing working processes.

关键词: automation     decision making     oil refinery     optimization     production scheduling    

Technology and system of constraint programming for industry production scheduling

Yarong CHEN, Zailin GUAN, Yunfang PENG, Xinyu SHAO, Muhammad HASSEB

《机械工程前沿(英文)》 2010年 第5卷 第4期   页码 455-464 doi: 10.1007/s11465-010-0106-x

摘要: The use of techniques and system of constraint programming enables the implementation of precise, flexible, efficient, and extensible scheduling systems. It has been identified as a strategic direction and dominant form for the application into planning and scheduling of industrial production. This paper systematically introduces the constraint modeling and solving technology for production scheduling problems, including various real-world industrial applications based on the Chip system of Cosytec Company. We trend of some concrete technology, such as modeling, search, constraint propagation, consistency, and optimization of constraint programming for scheduling problems. As a result of the application analysis, a generic application framework for real-life scheduling based on commercial constraint propagation (CP) systems is proposed.

关键词: constraint programming     production scheduling     constraint propagation     search     consistency     optimization    

生产调度的稳定性研究

李歧强,史开泉

《中国工程科学》 2001年 第3卷 第3期   页码 75-79

摘要:

生产调度中存在着大量的约束条件,它是否可行完全取决于所有约束条件是否都满足。文章研究了面向约束的调度稳定性问题。给出了硬约束、软约束和约束满意度的定义,提出了调度稳定度的概念,最后给出一个生产调度案例说明了调度稳定度在生产实际中应用的意义。

关键词: 生产调度     约束     满意度     调度稳定度    

Refinery production scheduling toward Industry 4.0

Marcel JOLY, Darci ODLOAK, Mario Y. MIYAKE, Brenno C. MENEZES, Jeffrey D. KELLY

《工程管理前沿(英文)》 2018年 第5卷 第2期   页码 202-213 doi: 10.15302/J-FEM-2017024

摘要: Understanding the holistic relationship between refinery production scheduling (RPS) and the cyber-physical production environment with smart scheduling is a new question posed in the study of process systems engineering. Here, we discuss state-of-the-art RSPs in the crude-oil refining field and present examples that illustrate how smart scheduling can impact operations in the high-performing chemical process industry. We conclude that, more than any traditional off-the-shelf RPS solution available today, flexible and integrative specialized modeling platforms will be increasingly necessary to perform decentralized and collaborative optimizations, since they are the technological alternatives closer to the advanced manufacturing philosophy.

关键词: cyber-physical systems     optimization     petrochemical industry     scheduling     smart manufacturing    

基于模糊规划的间歇过程生产调度建模

张虹,李歧强

《中国工程科学》 2004年 第6卷 第10期   页码 65-70

摘要:

通过对现有生产调度模糊模型的分析,针对间歇生产过程,提出了一种新颖的参数模糊的通用模糊规划建模方法,模糊模型采用2种基于普通遗传算法的模糊算法,即模糊模拟和SFA算法。该方法中,参数隶属函数选取灵活,采用合适的模糊表示方式。最后通过实例验证了该模糊建模方法是一种有效的方法。

关键词: 生产调度     模糊规划     间歇生产过程     隶属函数    

An assemble-to-order production planning with the integration of order scheduling and mixed-model sequencing

Baoxi WANG, Zailin GUAN, Yarong CHEN, Xinyu SHAO, Ming JIN, Chaoyong ZHANG

《机械工程前沿(英文)》 2013年 第8卷 第2期   页码 137-145 doi: 10.1007/s11465-013-0251-0

摘要:

For assemble-to-order enterprises, both order scheduling and mixed-model sequencing need to be taken into consideration in the formulation of order-oriented assembly plan. First, determining production priority for the received orders, and then conducting assembly sequence to the mixed-model products in each order. Order scheduling is aimed to ensure order delivery with the optimization goal of minimal total overdue time, while product sequencing is aimed to minimize the makespan so as to meet the requirement on completion time of the order. In the end, the paper establishes a mixed integer programming model based on an industrial case, and makes programming calculation with Xpress-MP to accomplish an order-oriented assembly plan conforming to actual production.

关键词: mixed-model assembly line     assemble-to-order     order scheduling     sequencing    

基于变量分离的生产调度空间划分算法

高永超,李歧强,丁然,郭庆强

《中国工程科学》 2006年 第8卷 第9期   页码 61-64

摘要:

静态生产调度大多形成MILP或MINLP模型,由于调度规模大及混合整数规划的组合优化特性,造成调度求解困难。通过对混合整数规划模型空间的分析,提出依据整数变量和连续变量的分离策略进行空间的自然划分,从而将模型的求解转化为多个较小规模连续子空间的寻优。对典型间歇调度模型的分析表明,将空间划分后进行连续寻优的策略较大地降低了实际运算的规模,降低了求解难度,可以提高问题的求解速度和效率。

关键词: 生产调度     空间划分     半限定方法    

MAS-based production scheduling system for manufacturing cell-based workshop

CHU Hong-yan, CAO Quan-jun, FEI Ren-yuan

《机械工程前沿(英文)》 2006年 第1卷 第4期   页码 375-380 doi: 10.1007/s11465-006-0043-x

摘要: The task of production scheduling is to determine the detailed machining path, time, machine tool, etc., for every work piece, according to the production objective and constraints. It is also an important part of the manufacturing system. In this paper, the manufacturing cell-based workshop is described and its scheduling system structure is established based on MAS (multi-agent system) technology. Through the negotiation and communication of each agent, the machining path is determined and the machining sequence and start time are calculated by GA (genetics algorithm). The communication among agents uses the CORBA (common object request broker architecture) technology of the OMG (Object Management Group). The CORBA-based architecture of the communication is designed and some interfaces for the communication are listed. For the genetics algorithm, chromosome coding, fitness function, parameters selection, and the basic genetics operation including selection, crossover and aberrance, are described. The scheduling system also can deal with some abnormal conditions, such as machine tool failure and urgent tasks. Finally, two scheduling examples are given.

关键词: negotiation     selection     multi-agent     communication     abnormal    

生产调度的模糊建模方法研究综述

张虹,李歧强,郭庆强,张鹏,高远

《中国工程科学》 2005年 第7卷 第12期   页码 92-102

摘要:

系统地总结了生产调度问题的各种传统建模方法, 并就模糊数学理论和传统建模及智能方法的结合, 综述了目前生产调度的模糊建模方法的研究进展和成果,提出了几个具有前途和代表性的关于这类问题的研究方法, 以期为这类问题的研究指出可行的道路和方向。

关键词: 生产调度     模糊数学     模糊建模    

Development and challenges of planning and scheduling for petroleum and petrochemical production

Fupei LI, Minglei YANG, Wenli DU, Xin DAI

《工程管理前沿(英文)》 2020年 第7卷 第3期   页码 373-383 doi: 10.1007/s42524-020-0123-3

摘要: Production planning and scheduling are becoming the core of production management, which support the decision of a petrochemical company. The optimization of production planning and scheduling is attempted by every refinery because it gains additional profit and stabilizes the daily production. The optimization problem considered in industry and academic research is of different levels of realism and complexity, thus increasing the gap. Operation research with mathematical programming is a conventional approach used to address the planning and scheduling problem. Additionally, modeling the processes, objectives, and constraints and developing the optimization algorithms are significant for industry and research. This paper introduces the perspective of production planning and scheduling from the development viewpoint.

关键词: planning and scheduling     optimization     modeling    

A review of intelligent optimization for group scheduling problems in cellular manufacturing

《工程管理前沿(英文)》   页码 406-426 doi: 10.1007/s42524-022-0242-0

摘要: Given that group technology can reduce the changeover time of equipment, broaden the productivity, and enhance the flexibility of manufacturing, especially cellular manufacturing, group scheduling problems (GSPs) have elicited considerable attention in the academic and industry practical literature. There are two issues to be solved in GSPs: One is how to allocate groups into the production cells in view of major setup times between groups and the other is how to schedule jobs in each group. Although a number of studies on GSPs have been published, few integrated reviews have been conducted so far on considered problems with different constraints and their optimization methods. To this end, this study hopes to shorten the gap by reviewing the development of research and analyzing these problems. All literature is classified according to the number of objective functions, number of machines, and optimization algorithms. The classical mathematical models of single-machine, permutation, and distributed flowshop GSPs based on adjacent and position-based modeling methods, respectively, are also formulated. Last but not least, outlooks are given for outspread problems and problem algorithms for future research in the fields of group scheduling.

关键词: cellular manufacturing     group scheduling     flowshop     literature review    

A carbon efficiency upgrading method for mechanical machining based on scheduling optimization strategy

Shuo ZHU, Hua ZHANG, Zhigang JIANG, Bernard HON

《机械工程前沿(英文)》 2020年 第15卷 第2期   页码 338-350 doi: 10.1007/s11465-019-0572-8

摘要: Low-carbon manufacturing (LCM) is increasingly being regarded as a new sustainable manufacturing model of carbon emission reduction in the manufacturing industry. In this paper, a two-stage low-carbon scheduling optimization method of job shop is presented as part of the efforts to implement LCM, which also aims to reduce the processing cost and improve the efficiency of a mechanical machining process. In the first stage, a task assignment optimization model is proposed to optimize carbon emissions without jeopardizing the processing efficiency and the profit of a machining process. Non-dominated sorting genetic algorithm II and technique for order preference by similarity to an ideal solution are then adopted to assign the most suitable batch task of different parts to each machine. In the second stage, a processing route optimization model is established to plan the processing sequence of different parts for each machine. Finally, niche genetic algorithm is utilized to minimize the makespan. A case study on the fabrication of four typical parts of a machine tool is demonstrated to validate the proposed method.

关键词: Low-carbon manufacturing     carbon efficiency     multi-objective optimization     two-stage scheduling     job shop    

Energy-aware scheduling with reconstruction and frequency equalization on heterogeneous systems

Yong-xing LIU,Ken-li LI,Zhuo TANG,Ke-qin LI

《信息与电子工程前沿(英文)》 2015年 第16卷 第7期   页码 519-531 doi: 10.1631/FITEE.1400399

摘要: With the increasing energy consumption of computing systems and the growing advocacy for green computing, energy efficiency has become one of the critical challenges in high-performance heterogeneous computing systems. Energy consumption can be reduced by not only hardware design but also software design. In this paper, we propose an energy-aware scheduling algorithm with equalized frequency, called EASEF, for parallel applications on heterogeneous computing systems. The EASEF approach aims to minimize the finish time and overall energy consumption. First, EASEF extracts the set of paths from an application. Then, it reconstructs the application based on the extracted set of paths to achieve a reasonable schedule. Finally, it adopts a progressive way to equalize the frequency of tasks to reduce the total energy consumption of systems. Randomly generated applications and two real-world applications are examined in our experiments. Experimental results show that the EASEF algorithm outperforms two existing algorithms in terms of makespan and energy consumption.

关键词: Directed acyclic graph     Dynamic voltage scaling     Energy aware     Heterogeneous systems     Task scheduling    

Decision Support System for emergency scheduling of raw water supply systems with multiple sources

Qi WANG, Shuming LIU, Wenjun LIU, Zoran KAPELAN, Dragan SAVIC

《环境科学与工程前沿(英文)》 2013年 第7卷 第5期   页码 777-786 doi: 10.1007/s11783-013-0537-9

摘要: A hydraulic model-based emergency scheduling Decision Support System (DSS) is designed to eliminate the impact of sudden contamination incidents occurring upstream in raw water supply systems with multiple sources. The DSS consists of four functional modules, including water quality prediction, system safety assessment, emergency strategy inference and scheduling optimization. The work flow of the DSS is as follows. First, the water quality variations on specific cross-sections are calculated given the pollution information. Next, a comprehensive evaluation on the safety of the current system is conducted using the outputs in the first module. This will assist in the assessment of whether the system is in danger of failure, taking both the impact of pollution and system capacity into account. If there is a severe impact of contamination on the reliability of the system, a fuzzy logic based inference module is employed to generate reasonable strategies including technical measures. Otherwise, a Genetic Algorithm (GA)-based optimization model will be used to find the least-cost scheduling plan. The proposed DSS has been applied to a coastal city in South China during a saline tide period as validation. Through scenario analysis, it is demonstrated that this DSS tool is instrumental in emergency scheduling for the water company to quickly and effectively respond to sudden contamination incidents.

关键词: decision support system     raw water supply system     contamination incident     emergency scheduling     hydraulic model     safety assessment    

Novel slack-based robust scheduling rule for a semiconductor manufacturing system with uncertain processing

Juan LIU, Fei QIAO, Yumin MA, Weichang KONG

《工程管理前沿(英文)》 2018年 第5卷 第4期   页码 507-514 doi: 10.15302/J-FEM-2018045

摘要:

The NP-hard scheduling problems of semiconductor manufacturing systems (SMSs) are further complicated by stochastic uncertainties. Reactive scheduling is a common dynamic scheduling approach where the scheduling scheme is refreshed in response to real-time uncertainties. The scheduling scheme is overly sensitive to the emergence of uncertainties because the optimization of performance (such as minimum make-span) and the system robustness cannot be achieved simultaneously by conventional reactive scheduling methods. To improve the robustness of the scheduling scheme, we propose a novel slack-based robust scheduling rule (SR) based on the analysis of robustness measurement for SMS with uncertain processing time. The decision in the SR is made in real time given the robustness. The proposed SR is verified under different scenarios, and the results are compared with the existing heuristic rules. Simulation results show that the proposed SR can effectively improve the robustness of the scheduling scheme with a slight performance loss.

关键词: semiconductor manufacturing system     uncertain processing time     dynamic scheduling     slack-based robust scheduling rule    

标题 作者 时间 类型 操作

Lessons learned from developing and implementing refinery production scheduling technologies

Marcel JOLY, Mario Y. MIYAKE

期刊论文

Technology and system of constraint programming for industry production scheduling

Yarong CHEN, Zailin GUAN, Yunfang PENG, Xinyu SHAO, Muhammad HASSEB

期刊论文

生产调度的稳定性研究

李歧强,史开泉

期刊论文

Refinery production scheduling toward Industry 4.0

Marcel JOLY, Darci ODLOAK, Mario Y. MIYAKE, Brenno C. MENEZES, Jeffrey D. KELLY

期刊论文

基于模糊规划的间歇过程生产调度建模

张虹,李歧强

期刊论文

An assemble-to-order production planning with the integration of order scheduling and mixed-model sequencing

Baoxi WANG, Zailin GUAN, Yarong CHEN, Xinyu SHAO, Ming JIN, Chaoyong ZHANG

期刊论文

基于变量分离的生产调度空间划分算法

高永超,李歧强,丁然,郭庆强

期刊论文

MAS-based production scheduling system for manufacturing cell-based workshop

CHU Hong-yan, CAO Quan-jun, FEI Ren-yuan

期刊论文

生产调度的模糊建模方法研究综述

张虹,李歧强,郭庆强,张鹏,高远

期刊论文

Development and challenges of planning and scheduling for petroleum and petrochemical production

Fupei LI, Minglei YANG, Wenli DU, Xin DAI

期刊论文

A review of intelligent optimization for group scheduling problems in cellular manufacturing

期刊论文

A carbon efficiency upgrading method for mechanical machining based on scheduling optimization strategy

Shuo ZHU, Hua ZHANG, Zhigang JIANG, Bernard HON

期刊论文

Energy-aware scheduling with reconstruction and frequency equalization on heterogeneous systems

Yong-xing LIU,Ken-li LI,Zhuo TANG,Ke-qin LI

期刊论文

Decision Support System for emergency scheduling of raw water supply systems with multiple sources

Qi WANG, Shuming LIU, Wenjun LIU, Zoran KAPELAN, Dragan SAVIC

期刊论文

Novel slack-based robust scheduling rule for a semiconductor manufacturing system with uncertain processing

Juan LIU, Fei QIAO, Yumin MA, Weichang KONG

期刊论文